You need to have Javascript enabled to use this site.
JavaScript is currently disabled or is not supported by your browser.
ID# BK203
Please note: I do not hold stocks of this kit, the kit will be made to order, which could take 4-6 weeks.
A more advanced level kit to build a timber framed building based on the Guildhall in Lavenham.
The parts are laser cut from quality plywood. Assembly of the shell of the building uses slots and tabs to ease construction. The timber framing is supplied as a series of overlays. The kit is designed to have the space between the timber framing filled with DAS or similar air drying clay. The roof, base wall and pavement are designed to have DAS applied and to use suitable Brick Impress Moulds to finish.
To complete the kit you will need glue, paint or stain, DAS and suitable impress moulds.
An interior detailing kit is also available (see below).
Size when completed: 4.5" L (115mm) x 9.6" W (245mm) x 7.6" H (192mm)
Please note: I have moved house and have yet to get the workshop set up. As this kit is made to order, there will be a delay in supplying this kit.
Click here to view the instructions for assembly.
Shopping Cart is Empty